Shortages appear on the floor
A job starts and a component is missing, because nobody checked the bill of material against stock before it was released.
Manufacturing
Bills of material, work orders and quality checks run on the same items and warehouses as inventory and purchase. Material is reserved when a job is released, consumed when it is built, and the finished goods arrive in stock carrying what they actually cost.
The problem
The shop floor usually knows what happened. The trouble is that nothing else in the business does until someone writes it up.
A job starts and a component is missing, because nobody checked the bill of material against stock before it was released.
Standard quantities are booked whatever was actually used, so scrap and substitutions never show up anywhere.
The cost of a finished unit comes from a sheet built last year, not from the material and time this batch took.
Inspection results sit in a binder, not on the batch, so a query from a customer starts a search.
Capabilities
Five groups, reading the items, warehouses and suppliers already held in the Core OS.
What a product is made of, and how.
What to make, and what it needs.
The job, from released to finished.
Checks recorded on the batch they belong to.
What it cost, and where the difference came from.
Workflow
The order that asked for it, the material it used and the batch it produced all carry the same reference.
A work order moves through six stages: the sales order, a material check, release, production, quality inspection and receipt into finished goods.
01 Sales order
WO-2026-0064
Confirmed
02 Material
WO-2026-0064
Available
03 Work order
WO-2026-0064
Released
04 Production
WO-2026-0064
Built
05 Quality
WO-2026-0064
Passed
06 Finished goods
WO-2026-0064
In stock
Use cases
A confirmed sales order raises the work order and the material it needs, and what cannot be covered from stock becomes a purchase request.
The batch of every component is recorded against the finished batch, so a recall is a lookup rather than a search.
Finished batches are held until their inspection passes, so nothing reaches available stock that has not been signed off.
Works with
These read and write the same Core OS records, so a handover between them passes a reference rather than a retyped copy.
Real-time stock across warehouses, batches and serial numbers.
Requests, purchase orders, supplier pricing and receipts.
Quotations, sales orders, pricing and customer terms.
Invoicing, receivables, payables and one double-entry ledger.
FAQ
Yes. A sub-assembly has its own bill and can be planned as its own work order, so the material for every level is worked out together.
The work order records what was actually used, including scrap and substitutions. The difference from the bill is visible as a variance instead of disappearing into stock.
Yes. An item can require a quality inspection before it is received, and the inspection result stays on the batch for anyone who needs it later.
From what the work order actually consumed — material at its stock valuation plus the operation costs — not from a standard figure on the bill.
Have a different question? Talk to us.
Bring one bill of material and last week’s production. We will show what it looks like when the stock, the job and the cost are all reading the same record.