Skip to content

Building Materials

Sold by weight. Delivered to site. Costed with the freight.

Cement, steel, aggregates and blocks are sold by the bag, the tonne and the cubic metre, delivered to a site gate rather than an address, and carried on trucks whose cost is a real share of the margin. OrbitWix keeps weight on every line, the site on every order and the freight on the delivery it paid for.

The problem

Where building supply margin disappears.

The price per tonne looks fine. The margin is lost on the truck, at the site and in the paperwork.

Freight is an overhead line

Transport cost lands in a general expense account, so the margin on each order looks better than it is — and worst on the sites furthest away.

Trucks leave half full, or overloaded

Weight is not on the order lines, so loads are planned by eye and a second trip is found out at the yard.

A site is not an address

Plot 14, gate 2, ask for the site engineer. That lives in the driver’s phone rather than on the order.

Deliveries are disputed

The site says 110 bags arrived; the yard says 120 left. Without a signed count on the note, the argument has no end.

Typical workflow

How a site delivery runs.

The order knows its weight before it is planned, and the freight knows its order after it is paid.

Order to freight cost

A site delivery moves through six stages: confirmed order, load plan, loading, the trip, delivery to site and freight cost allocated to the order.

  1. 01 Order

    SO-2026-0203

    Confirmed

  2. 02 Load plan

    SO-2026-0203

    20.4 t

  3. 03 Loading

    SO-2026-0203

    Loaded

  4. 04 Trip

    SO-2026-0203

    On the way

  5. 05 Site

    SO-2026-0203

    Delivered

  6. 06 Freight

    SO-2026-0203

    Costed

The solution

What OrbitWix puts in place.

Six parts, built around weight, the site and the truck.

Weight and volume on every line

Item weights and unit conversions, so an order knows its tonnage — bags, tonnes and cubic metres together — before it is planned.

Read about Sales

Sites as delivery addresses

Each site a delivery address under the contractor, with its own contact and instructions printed on the note.

Read about Sales

Load planning by capacity

Orders planned onto trucks by weight against the vehicle’s capacity, so a load is right before it is loaded.

Read about Logistics

Freight on the order

Trip cost allocated to the deliveries it carried, so margin is reported after freight, not before.

Read about Logistics

Proof of delivery at the gate

The quantity counted and signed for at the site, recorded on the delivery note it belongs to.

Read about Dispatch

Credit control for contractors

Limits and terms on the contractor, with orders held for approval when they would go over.

Read about Finance

Example

One delivery, one site.

An illustration of one order from confirmation to costed delivery. The names are made up; the sequence is the ordinary one.

Lakeview Villas, plot 14
  1. Mon 11:00 A contractor orders 120 bags of cement, 2.4 t of 12 mm bar and 8 m³ of sand for Lakeview Villas, plot 14. The order is checked against their credit limit and comes to 20.4 t.
  2. Tue 14:00 Dispatch plans it onto a 21 t truck. One load, no second trip.
  3. Wed 07:00 Loaded and out. The delivery note carries the site, gate 2 and the site engineer’s number.
  4. Wed 10:40 The site engineer counts 120 bags and signs. Proof of delivery is recorded on the note.
  5. Wed 16:00 The trip’s cost of 260.00 is allocated to the order — 12.75 per tonne — and the order’s margin after freight is 11.8%.

Visibility

Reports you read, and work you stop doing.

Both read the same records the work is done on, so neither needs an export to stay current.

Reports

  • Margin after freightBy order, by customer and by site.
  • Freight cost per tonneBy route, by vehicle and by carrier.
  • Deliveries by siteWhat each site has received, and what is still to go.
  • Vehicle utilisationTonnes carried against capacity, trip by trip.
  • Contractor receivablesWhat each contractor owes, and since when.

Automation

  • An order is held for approval when it would take a contractor over their limit
  • Freight cost is allocated across the deliveries on a trip by weight
  • A watch on deliveries still open at the end of the day Early access

Items marked early access run on Watcher, which is still being finished.

Recommended apps

Where to start.

Building materials suppliers usually start with selling and delivering, and add Logistics as soon as freight needs to land on the order.

Sales

Orders by weight and volume, sites as delivery addresses.

Read about Sales

Dispatch

Loading sheets, delivery notes and proof of delivery at the gate.

Read about Dispatch

See the full catalogue

FAQ

Questions from building materials suppliers.

Can one item be sold in bags and by the tonne?

Yes. An item has a stock unit and conversions — a bag of cement is 50 kg, so 120 bags is 6 tonnes. Orders, notes and invoices each show the unit that makes sense to the reader.

How is freight costed onto an order?

The trip’s cost is recorded once and allocated across the deliveries it carried, by weight. Each order then reports its margin after freight.

Can one contractor have many sites?

Yes. Each site is a delivery address under the contractor, with its own contact. The contractor has one credit limit and one balance; deliveries can be reported site by site.

What about unused material coming back?

A return is recorded against the original delivery, goes back into stock, and is credited against the invoice it came from.

Have a different question? Talk to us.

See your freight on your orders.

Bring a week of delivery notes and the transport invoices that went with them. We will show the margin on each order once the truck is counted.